Cliff: Commercial fleet charging

The charging network for Africa's electric fleets.

We are developing an EV charging infrastructure network for commercial fleets, beginning in Lagos. We are working to establish first site and fleet partnerships. No Cliff charging stations are operating yet.

White electric vehicle connected to a charging station

Who we are

A charging infrastructure company, from site planning to daily operation.

We are developing Cliff as a fleet focused charging infrastructure business, with the first proposed projects in Lagos.

Our first priority is charging for commercial fleets. A proposed depot or shared site must make sense for the vehicles, operating windows, available electricity and actual project costs.

Some future sites may serve one fleet. Others could serve several approved operators. Wider public access would depend on spare capacity and commercial need. These are proposed service models, not operational sites.

Why now

Commercial electric mobility creates a new infrastructure need.

Africa's EV market remains early, but Lagos already has observable commercial fleet activity. We believe charging designed around fleet schedules and electrical conditions is worth developing.

25,000

Estimated electric car sales across Africa in 2025, up from approximately 4,000 in 2023, according to the IEA. These are regional sales, not Cliff demand.

20,000

RMI's estimate of total electric vehicles in Nigeria at the end of 2025, across vehicle types. This is not a verified count of customers or charging compatible fleets.

Lagos fleet activity

LagRide introduced 100 electric vehicles in September 2025. That is an observed market signal, not a commercial agreement with Cliff.

Sources: IEA Global EV Outlook 2026, RMI Nigeria research and LagRide announcement.

What we do

From a viable site to an operating charging service.

Charging hardware is one part of the work. We bring together the electrical plan, equipment, physical layout, access rules and operating support required to keep a site useful.

01

Site assessment and charging design

We review vehicle activity, dwell time, parking conditions, access, power availability and expected use before selecting equipment. We build the charging plan around the job the site needs to perform.

02

Power and electrical planning

We evaluate available electrical capacity alongside the energy vehicles require and the time available to deliver it. We balance charger power, site capacity and operating demand before deployment begins.

03

Deployment and commissioning

We bring together charging equipment, electrical works, parking layout and site access, then install, configure and commission the complete system before regular use.

04

Access configuration

We configure each location for private, shared or public use according to the commercial and operating purpose of the site.

05

Monitoring and maintenance

Once a site is commissioned, our operating model covers availability monitoring, equipment inspection, fault response and maintenance so charging can remain dependable day after day.

06

Capacity growth

Where the property and electrical system allow it, we plan for future demand and add charging capacity as vehicle numbers and regular use increase.

Close-up of a charging connector plugged into a white electric vehicle

Our infrastructure approach

A charging site is more than a charger.

We design the equipment around the electrical supply, the vehicles, the parking environment and the time those vehicles remain on site. A high-power charger in the wrong place can be less useful than a properly sized system that fits the operating day.

Our delivery model continues through commissioning and daily operation. Installed capacity matters, but dependable access to working infrastructure is what keeps vehicles moving.

Rows of commercial fleet vans in a large operating yard

Where we fit

Charging around the places vehicles already work and wait.

Our first customers would be commercial fleets with recurring charging requirements. Property owners, energy specialists and infrastructure partners can help create the suitable sites.

There is no operating Cliff network for drivers to use today. The initial projects must establish customer demand, technical feasibility and dependable service before wider access is considered.

See how we work with fleets and site partners

How we work

From an operating requirement to a working charging site.

01

Assess

We analyse the vehicles, routes, parking, access, dwell time and available electrical supply to establish exactly what the site needs to achieve.

02

Design

We match charger power, quantity, electrical capacity and physical layout to the operating window and expected use.

03

Prepare

We plan the electrical works, equipment positions, parking arrangements, protection, access and construction sequence required for the site.

04

Deploy

We install the charging equipment and supporting electrical infrastructure, then configure the location for its intended users.

05

Commission

We test the installed system, confirm charging and access behaviour and prepare the location for regular operation.

06

Operate

Once the site enters service, we monitor availability, handle faults, maintain equipment and review capacity as the fleet, property or user base changes.

Access models

Private, shared and public charging for different operating needs.

We configure access around who needs to use the location, when they need it and how the site fits the property or fleet it serves.

Private

We dedicate charging capacity to a single fleet, company or approved group where the infrastructure forms part of a controlled transport operation.

Shared

We configure business parks, commercial properties and partner sites to serve multiple approved organisations or user groups under defined access rules.

Public

We open compatible charging capacity more broadly under location-specific operating hours, pricing, parking rules and availability.

Our network

Different sites, connected by one operating standard.

We do not force a depot, workplace and public charging location to behave the same way.

Each site keeps the access rules, capacity and operating hours that make sense for its users. We connect those locations through a consistent discipline for planning, commissioning, monitoring and maintenance.

As future locations are approved, we intend to expand coverage for fleets where continued demand and site operations justify it.

Deployment roadmap

Our rollout plan.

We are seeking fleet and site partners for proposed initial Lagos locations. Site rights, power engineering, customer terms and financing come before construction. Wider access and other markets depend on what the first sites prove.

Anchor sites

We secure fleet and property partners, assess power and parking, and define the first locations.

Deploy and operate

We will install, commission and operate the first sites, using real utilisation and operating data to guide what comes next.

Open shared access

Where a site has spare capacity and the right access model, we open it to additional approved fleets and drivers.

Build coverage

We add public and corridor locations where traffic, demand and site conditions support reliable operation.

Initial deployment partners

Could your fleet or property help shape the first projects?

We are seeking fleet operators, energy specialists and property partners for our proposed first Lagos charging sites.

Discuss an initial project

Investors and strategic partners

The infrastructure opportunity behind commercial electrification.

We welcome conversations about the Lagos investment case, project financing, site partnerships and what the first sites would need to prove.

Investment overview